SM35-P35
SMICO
10-16mm²
500000/month
Thermoplastic Fibre Glass Reinforced Reinforced nylon
Availability: | |
---|---|
Modle | Conductor range(mm2) | Torque(N.M) | Insulator Endurance(6kv.1min) | Ageing Test (salt spray) |
SM35-P35 | 10-16 | 10 | OK | OK |
H1 | 16-35 | 10 | OK | OK |
Simple installation
INSTALATION
There is no need to adjust the pre-positioned shearhead bolts prior to assembly.
If required ,strip the conductor to the length specified on the connector.
Begin the assembly wth the head conductor
Insert each conductor fully along the axis of the connector .Hold the conductor in place whilst pre-tightening the shearhead bolts to locate the cable .
For Installation under load (max.90A)(RED Side only )
Secure the connector with the 1st conductor instlled ,to the ABC bundle with tape or a cable tie.
Secure the electrical contact etween the stripped conductor and the end of the adaptor during the tightening.
To complete the installation,tighten the shearhead bolt until breaks off.
II -DISMANTLING "RED"SIDE ONLY
The connector can be removed ,off load ,for the red side by use 2nd remaining hex head.
To remove under load ,cut the conductor approx,I c from the connector,using an appropriate cable cutter.
Then lose the "red" screw and remove the remaining section.
Use the plug provided to reseal the connector.
III-REINSTALLATION "RED"SIDE ONLY
Strip the conductor to the length specified on the connector.
Insert the stripped end of the conductor into the connector ,as instructed in section 1.
To complete the installation ,tighten the hex head bolt to the torque level specified on the connector .
IV-CAUTION(SM35-P35)
Care should be taken to ensure that the correctly prepared conductor is inserted into the correct end of the connector.
'RED' load making sied for stripped conductor.
LACK insulation piercing for un-stripped conductor
Modle | Conductor range(mm2) | Torque(N.M) | Insulator Endurance(6kv.1min) | Ageing Test (salt spray) |
SM35-P35 | 10-16 | 10 | OK | OK |
H1 | 16-35 | 10 | OK | OK |
Simple installation
INSTALATION
There is no need to adjust the pre-positioned shearhead bolts prior to assembly.
If required ,strip the conductor to the length specified on the connector.
Begin the assembly wth the head conductor
Insert each conductor fully along the axis of the connector .Hold the conductor in place whilst pre-tightening the shearhead bolts to locate the cable .
For Installation under load (max.90A)(RED Side only )
Secure the connector with the 1st conductor instlled ,to the ABC bundle with tape or a cable tie.
Secure the electrical contact etween the stripped conductor and the end of the adaptor during the tightening.
To complete the installation,tighten the shearhead bolt until breaks off.
II -DISMANTLING "RED"SIDE ONLY
The connector can be removed ,off load ,for the red side by use 2nd remaining hex head.
To remove under load ,cut the conductor approx,I c from the connector,using an appropriate cable cutter.
Then lose the "red" screw and remove the remaining section.
Use the plug provided to reseal the connector.
III-REINSTALLATION "RED"SIDE ONLY
Strip the conductor to the length specified on the connector.
Insert the stripped end of the conductor into the connector ,as instructed in section 1.
To complete the installation ,tighten the hex head bolt to the torque level specified on the connector .
IV-CAUTION(SM35-P35)
Care should be taken to ensure that the correctly prepared conductor is inserted into the correct end of the connector.
'RED' load making sied for stripped conductor.
LACK insulation piercing for un-stripped conductor