NES-B1
SMICO
4x(16-35)
Availability: | |
---|---|
This clamp is designed to anchor the low voltage fully supportedA.B.C.(Aerial Bundled Conductors).
Description
- The arms are made of hot-dip galvanised steel. A bolt enables the clamp to be easily dismantled manually and anchored on a bracket fixed to a pole or façade.
- The cleats are made of UV resistant, glass fibre reinforced synthetic material.
- The conductors are attached using a combination of bolts and cleats. Two 17mm shear head nuts are used to control the tightening torque.
- Each conductor runs through a separate channel. The conductors are anchored by distributing the loads, protecting the insulation.
- A large opening facilitates the passage of the conductors between the clamp arms.
Implementation
- Unscrew the nuts.
- Open the A.B.C and insert each conductor into one of the channels.
- Screw the nuts alternately using a 17mm spanner until the shear head breaks. The 21mm head is only provided for possible dismantling.
- Anchor the clamp on a hook.
- Additional tightening is achieved automatically by the cleats.
Material: Mild Steel ,Nylon plus fiber glass
Product property : It is used to terminate 4-core of aerial bundle conductor. Its function is fixing and tightening the insulation conductor .
Modle | Conductor Cross-Section(mm2) |
NES-B1 | 4X(16-35) |
NES-B2 | 4X(50-120) |
NES-B3 | 4X(25-120) |
NES-B4 | 4X(95-150) |
This clamp is designed to anchor the low voltage fully supportedA.B.C.(Aerial Bundled Conductors).
Description
- The arms are made of hot-dip galvanised steel. A bolt enables the clamp to be easily dismantled manually and anchored on a bracket fixed to a pole or façade.
- The cleats are made of UV resistant, glass fibre reinforced synthetic material.
- The conductors are attached using a combination of bolts and cleats. Two 17mm shear head nuts are used to control the tightening torque.
- Each conductor runs through a separate channel. The conductors are anchored by distributing the loads, protecting the insulation.
- A large opening facilitates the passage of the conductors between the clamp arms.
Implementation
- Unscrew the nuts.
- Open the A.B.C and insert each conductor into one of the channels.
- Screw the nuts alternately using a 17mm spanner until the shear head breaks. The 21mm head is only provided for possible dismantling.
- Anchor the clamp on a hook.
- Additional tightening is achieved automatically by the cleats.
Material: Mild Steel ,Nylon plus fiber glass
Product property : It is used to terminate 4-core of aerial bundle conductor. Its function is fixing and tightening the insulation conductor .
Modle | Conductor Cross-Section(mm2) |
NES-B1 | 4X(16-35) |
NES-B2 | 4X(50-120) |
NES-B3 | 4X(25-120) |
NES-B4 | 4X(95-150) |